Situation
A facility in the UAE needed a reliable backup power solution to ensure their continuity in the event of a loss of primary power. The facility had critical electrical loads which did not always rely on the main power source, so there was a need for the facility to take the electrical load to an alternative source when needed.
The client was therefore seeking for an appropriate automatic transfer switch in UAE to facilitate the seamless handover from the mains power to the backup power source. More than just choosing a typical electrical component, the switching equipment needed to be suitable for the facility’s electric needs and fit into the current back-up plan.
Prior to the installation the facility had to find an appropriate ATS and ensure the equipment would operate effectively in the facility’s power system. The client required a professional supplier that can determine their need, advise on an appropriate solution and offer technical support.
Client Profile
Industry / Segment: Commercial / Industrial Facility
Location: UAE
Requirement: A reliable automatic transfer solution for maintaining power continuity between the primary and backup sources.
The facility required a solution that could automatically manage the changeover between power sources and reduce the need for manual intervention during a power interruption.

Main Problems Faced by the Client
The facility’s main concern was maintaining continuity of power when the primary electricity supply became unavailable. Manual switching could introduce delays and place additional responsibility on facility personnel during an outage.
The client had to make sure that the transfer equipment would fit into the existing electrical system. A wrong selection may result in compatibility or reliability problems of the backup power system.
Another criterion was a high-quality professional technical assistance. The facility desired a supplier that could assist them in the selection and installation of the system, as opposed to supplying just an electrical panel.
The client thus required a reliable automatic transfer switch UAE solution backed by the required technical expertise and service..
Project Objectives
The project was focused on improving the facility’s backup power changeover process through a suitable ATS solution.
The key objectives were to:
- Understand the facility’s power-transfer requirement.
- Assess the existing primary and backup power arrangement.
- Identify a suitable ATS configuration.
- Ensure compatibility with the facility’s power system.
- Support automatic transfer between power sources.
- Reduce dependence on manual intervention.
- Provide professional technical assistance.
- Support testing, commissioning and follow-up requirements.
The objective was to provide a practical switching solution capable of supporting reliable power continuity for the facility.

Solutions Implemented by Bright Power
Bright Power began with a consultation to understand the facility’s requirements and the relationship between its main power supply and backup source. This assessment helped determine the type of ATS arrangement required for the application.
As an ATS supplier UAE facilities can approach for backup power requirements, Bright Power provides different ATS options, including contactor-type and motorized systems. Its published product information also lists solutions from manufacturers such as Schneider/ABB, Socomec and ASCO.
Based on the requirement, Bright Power recommended an appropriate ATS solution for the facility. The solution was intended to automatically manage the transfer of electrical loads between the primary and backup sources when the normal supply was interrupted.
The implementation involved:
- Initial consultation and requirement assessment.
- Review of the facility’s power arrangement.
- Evaluation of suitable ATS options.
- Product recommendation based on the application.
- Supply and coordination of the selected equipment.
- Installation and configuration support where applicable.
- Testing and commissioning.
- Follow-up technical assistance.
The approach focused on creating a coordinated backup power arrangement rather than treating the ATS as an isolated electrical component.
Step-by-Step Execution

1. Requirement Assessment
Bright Power first discussed the facility’s power-transfer requirements with the client. The team considered the role of the main supply, the backup source and the requirement for automatic changeover.
This helped establish the technical requirements that would guide the ATS selection.

4. Supply and Implementation
After the appropriate equipment was identified, Bright Power coordinated the supply and implementation process. The company’s services include programming and installation of generators and panels, along with maintenance, commissioning and testing services.

2. Power System Review
The existing power arrangement was reviewed to understand how the automatic transfer system would interact with the facility’s primary and backup sources.
This stage was important for identifying a suitable configuration and avoiding an unsuitable or incompatible selection.

5. Testing and Commissioning
The ATS arrangement was checked as part of the implementation process to ensure the transfer sequence could operate as intended.
Testing and commissioning are particularly important for a generator transfer switch, as the system needs to coordinate the transition between the normal supply and the generator or alternative source.

3. ATS Selection
Bright Power then recommended an ATS solution appropriate to the facility’s requirements. The selection focused on the required transfer function, system compatibility and expected operating conditions.
The solution was designed to detect the loss or failure of the primary supply and facilitate transfer to the available backup source.

6. Follow-Up Support
Bright Power also provides maintenance and emergency call-out support for its power solutions. This gives the facility access to technical assistance after implementation rather than limiting the engagement to the initial supply.
Client Result Achieved & Feedback
The facility received an ATS solution designed to support automatic transfer between its primary and backup power sources. By assessing the requirement before recommending the equipment, Bright Power helped address the client’s need for a more organised and dependable power-transfer arrangement.
The solution also provided the facility with professional technical support across the equipment selection and implementation process. Bright Power’s wider service offering includes installation, commissioning, testing and maintenance, supporting the facility beyond the initial product supply.
Key Features
- Automatic transfer between primary and backup power sources
- Application-focused ATS selection
- Suitable ATS configuration for facility requirements
- Professional installation and commissioning support
- Testing and maintenance assistance
- Technical support and emergency service availability
- Compatibility-focused product recommendation
- Solutions for commercial and industrial applications
The project provided the facility with a structured approach to power-source changeover, supported by Bright Power’s expertise in ATS and broader power transfer systems.